TransPhotoTransportul electric urban

Roster

Coimbra, Metro Mondego


Electric BRT system currently under construction. Will use Zhongtong articulated electric buses (delivery was planned in December 2023, but still pending).


Service:  any  ·  passenger  ·  work / freight  ·  museum

Nothing found

Settings

Show all records in one table  ·  Show all withdrawn and transferred vehicles in a separate table  ·  Operational first
Abandoned up  ·  Abandoned down
Table without photos  ·  Show photos
Full history  ·  Short history
Include submodels  ·  Exact model
Show chassis model  ·  Hide chassis model

Show in the list:  Numărul de serie  ·  VIN  ·  Chassis #