საქალაქო ელექტრო ტრანსპორტი |
Chronology: HangzhouAdd record · Search in Chronology 9 მაისი 2023 წელიGeely Commercial Vehicles with "Yuancheng" brand vehicles wins a tender for the supply of 790 electric buses for a total cost of ¥463280000 (~$66.6 million USD) including lifetime warranty.
• 700 8 metre buses • 90 6 metre buses (for Yuhang district) Deliveries are to be finished in 2023, and will replace most of the 12 metre BYD K9A and K9F delivered in 2014 and 2015. 29 მარტი 2023 წელიTrolleybus contact network on Jiangcheng Road is reconnected to power after disconnection in 2016 for construction of metro line 5; the trolleybus u-turn at Xiongzhenlou terminus is also rebuilt.
This is used by route 151. 6 ნოემბერი 2021 წელიMetro line 6 extended 9 km from Qianjiang Century City to Goujulong.
https://www.magnetic-access.com/en-US/ne...-3.html 21 თებერვალი 2021 წელიOpening day of metro lines 3 and 10, line 4 is extended 26 km.
https://www.railwaygazette.com/metros/ha...article 2021 წელიTrolleybus route K155 starts to be supplemented by battery electric buses.
2019 წელიAbandoned Yutong ZK6125BEVG10 are moved elsewhere for storage.
3 თებერვალი 2018 წელიAll abandoned Yutong ZK6125BEVG10 trolleybuses are permanently stored on the south bank of the Qiantang River, with electrical equipment also dismantled.
|
მთავარი ფორუმი წესები სარედაქციო ჯგუფი მუქი თემა © საიტის ადმინისტრაცია და სურათების ავტორები, 2002—2024
სურათების და სხვა ინფორმაციის გამოყენება ავტორის უფლების გარეშე აკრძალულია. |