Строительство и ремонты
 |
Via Racconigi
Construction of the future extension Fulvio Testi — Pronto Soccorso Niguarda.
8 април 2025 г. Автор: busnotturno95
|
 |
Via Racconigi
The construction works of the Fulvio Testi — Pronto Soccorso Niguarda segment are in full throttle, with the area for the future track laying being cleared.
8 април 2025 г. Автор: busnotturno95
|
 |
Via Anassagora
This is the junction between the existing line running from Piazzale Mattei and the extension towards Via Adriano; the tracks here are first laid onto the concrete's reinforcement, which will later get covered with such concrete and then covered in grass; this procedure has been used for the entire extension, as the line crosses a quite populated residential area.
6 октомври 2024 г. Автор: busnotturno95
|
 |
Corso XXII Marzo
Реконструкция трамвайных путей на одной из центральных улиц Милана. Фото сделано из автобуса на котором я заехал в Милан буквально на пару часов, по пути в аэропорт Мальпенза
13 октомври 2010 г. Автор: alex26
|
 |
Corso XXII Marzo
Реконструкция трамвайных путей на одной из центральных улиц Милана. Фото сделано из автобуса на котором я заехал в Милан буквально на пару часов, по пути в аэропорт Мальпенза
13 октомври 2010 г. Автор: alex26
|
Показано снимка: 5 из 5