Elektrická Městská Doprava | ||||||||||
Metro Mondego: Testing and IntroductionCoimbraIn 2024, Metro Mondego began the first full operational tests of its new Metrobus system on the former Ramal da Lousã railway corridor, which was closed in January 2010 to allow the line to be converted into a light-rail system. This was later changed to a metrobus instead of light-rail. These activities included running trials with the vehicles, verification of technical specifications, and testing of the optical‑guidance system designed to ensure precision docking at stations. Initial tests were carried out on the Serpins – Alto de São João section, the most advanced part of the network. These trials marked the introduction phase of the system ahead of public service, following the delivery of the first vehicles and the completion of key infrastructure segments.
Zobrazeno: 5 z 5
Fotografie seřazeny podle data pořízení, nejnovější nahoře.
| ||||||||||
| Hlavní stránka Fórum Pravidla Redakce Dark mode © Administrace Transphoto a autoři fotografií, 2002—2026
Použití fotografií a jiných materiálů zveřejněných na těchto stránkách je povoleno pouze se souhlasem jejich autorů. |