12.05.2025 Publication of tender for purchase of 40 electric buses (10m) through the South-East Regional Program 2021-2027.
16.11.2024 The modernization works of the tram infrastructure in Monument Park have been completed, at which point trams of lines 21 and 22 are back on the routes.

Due to the still incompletely modernized infrastructure, trams only run between Monument Park and Pod Brăilița (Calea Galați), via Dorobantilor Boulevard (line 22) and Independenței Boulevard (line 21).
14.07.2023 Publication of tender for purchase of minimum 6, maximum 8 trams (18m) through the National Recovery and Resilience Plan.
10.10.2023: contract was signed with Astra Vagoane Călători.
29.05.2023 Tram traffic on the main routes is suspended due to the start of the modernization of the tram infrastructure. The only routes that will continue to be operational are line 24 to Combinat endstation and line 25 to Lacu Sărat village, both with starting point from the Radu Negru Depot.
10.04.2022 Publication of tender for purchase of 2 trams (18m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
31.08.2022: contract was signed with Astra Vagoane Călători.
07.11.2023: all trams were delivered.
All Entries

Quick Vehicle Search

Number:

Photos By Route

Route:

Tramway Facilities / Operators



Trolleybus Facilities / Operators


Electric Bus Facilities / Operators



New Photos

» Tramway Lines and Infrastructure
All updates


Active Photographers of the City

1st place: M. N. — 41 photos
2nd place: Karel Šimána — 31 photos
3rd place: focus1965 — 24 photos

Full list of photographers

   

Random Photo

6


New Photos