Brăila
Editor: Andrei Andraș.
Comments: all · tramway · trolleybus · electric Bus
Chronology
12.05.2025 |
Publication of tender for purchase of 40 electric buses (10m) through the South-East Regional Program 2021-2027. |
16.11.2024 |
The modernization works of the tram infrastructure in Monument Park have been completed, at which point trams of lines 21 and 22 are back on the routes.
Due to the still incompletely modernized infrastructure, trams only run between Monument Park and Pod Brăilița (Calea Galați), via Dorobantilor Boulevard (line 22) and Independenței Boulevard (line 21). |
14.07.2023 |
Publication of tender for purchase of minimum 6, maximum 8 trams (18m) through the National Recovery and Resilience Plan.
10.10.2023: contract was signed with Astra Vagoane Călători. |
29.05.2023 |
Tram traffic on the main routes is suspended due to the start of the modernization of the tram infrastructure. The only routes that will continue to be operational are line 24 to Combinat endstation and line 25 to Lacu Sărat village, both with starting point from the Radu Negru Depot. |
10.04.2022 |
Publication of tender for purchase of 2 trams (18m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
31.08.2022: contract was signed with Astra Vagoane Călători.
07.11.2023: all trams were delivered. |
| All Entries |
Photos By Route
Tramway Facilities / Operators
Trolleybus Facilities / Operators
Electric Bus Facilities / Operators
Maps
City Photo Galleries
New Photos
» Tramway Lines and Infrastructure
All updates
|
|
Random Photo

    
|
|