14.07.2023 Publication of tender for purchase of minimum 6, maximum 8 trams (18m) through the National Recovery and Resilience Plan.
10.10.2023: contract was signed with Astra Vagoane Călători.
29.05.2023 Tram traffic on the main routes is suspended due to the start of the modernization of the tram infrastructure. The only routes that will continue to be operational are line 24 to Combinat endstation and line 25 to Lacu Sărat village, both with starting point from the Radu Negru Depot.
10.04.2022 Publication of tender for purchase of 2 trams (18m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
31.08.2022: contract was signed with Astra Vagoane Călători.
07.11.2023: all trams were delivered.
27.02.2022 Publication of tender for purchase of 6 electric buses (10m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
25.07.2022: contract was signed with BMC Truck & Bus (romanian importator for ZTE Smart Auto buses).
2023: all electric buses were delivered.
25.09.2020 Publication of tender for purchase of 11 electric buses (10m) through the Ministry of Regional Development and Public Administration.
17.01.2022: contract was signed with BMC Truck & Bus (romanian importator for ZTE Smart Auto buses).
11.08.2023: all electric buses were delivered.
All Entries

Quick Vehicle Search

Number:

Photos By Route

Route:

Tramway Facilities / Operators



Trolleybus Facilities / Operators


Electric Bus Facilities / Operators


Maps

City Photo Galleries


New Photos

» Miscellaneous Photos
» Transport and animals
» Tramway — 4689.
All updates


Active Photographers of the City

1st place: M. N. — 41 photos
2nd place: Karel Šimána — 31 photos
3rd place: focus1965 — 24 photos

Full list of photographers

   

Random Photo

3


New Photos