Chronology
25.04.2021 |
The first Green Line of the Taichung MRT (Mass Rail Transit) automated metro opens. The elevated line is 16,7 km-long and has 18 stations. The line is operated with 36 two-car units by Kawasaki/TRSC. |
16.11.2020 |
16-21.11.2020 — Free trial runs of the new Green metro line. Operating hours — 07:00-20:00 |
| All Entries |
Photos By Route
Subway Facilities / Operators
Maps
City Photo Galleries
New Photos
» Metro Lines and Infrastructure» Metro — 03, 04, 05, 06, 07, 08, 09, 10, 14, 23, 24, 27, 28, 29, 30, 31, 32.
» Metro Lines and Infrastructure» Metro — 01, 02, 09, 13, 14, 17, 21, 22, 29, 30, 31, 32, 33, 34.
» Maps » Miscellaneous Photos » Metro Lines and Infrastructure
All updates
|
|
Random Photo
|