![]() |
Chronologija: VasluiPridėti įrašą · Paieška naujienose 2024 m. gegužės 16 d.Publication of tender for purchase of 13 electric buses (10m) through the National Recovery and Resilience Plan.
12.03.2025: contract was signed with BMC Truck & Bus (romanian importator for ZTE Smart Auto buses). 2021 m. vasario 18 d.Republication of tender for purchase of 10 trolleybuses (12m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
14.07.2021: contract was signed with Solaris Bus & Coach. 2023: all trolleybuses were delivered. 2016 m. birželio 13 d.A test run with passengers via the reinstated and lengthened single trolleybus line. One of the three ex-Salzburg second-hand trolleybus was used. The new route will receive designation as the Line T. The line is extended from the former Textila Terminal for further 2 km. to Moara Grecilor. The total length of the line will thus constitute 6,5 km. The regular service commencement date is unknown. Trolleybus service was suspended since 07.07.2009.
http://transphoto.ru/photo/910443/ 2009 m. liepos 7 d.Closure of the trolleybus operation in the city.
1994 m. gegužės 1 d.Opening of the Vaslui trolleybus system.
|
Pradžia Forumas Taisyklės Administracija Tamsi tema © TransPhoto administracija ir turinio autoriai, 2002—2025
Nuotraukų ir kito publikuojamo tinklapyje turinio naudojimas galimas tik gavus turinio autorių sutikimą. |