Kentsel Elektrikli Ulaşım |
Chronology / news: BangkokAdd record · Search in Chronology / News 7 Ocak 2024 YılThe MRT Pink Line (Wiwat Nakhon Line) has become operational on a regular basis, marking the end of the trial phase for this monorail system.
23 Kasım 2023 YılTrial operations have begun on the MRT Pink Line (Wiwat Nakhon Line) monorail system.
28 Eylül 2023 YılThe Suvarnabhumi Airport Automated People Mover, built by Siemens, has opened at Bangkok’s main airport.
The two-station line runs between the main terminal and the new SAT-1 island terminal. Six two-car driverless Siemens Airval units have been put into regular service. 3 Temmuz 2023 YılThe MRT Yellow Line (Nakkhara Phiphat Line) has commenced regular service following a month of trial operations.
16 Aralık 2020 YılGold Line passenger services have been launched.
The unmanned system, which is less than two kilometers long, was built on the initiative of the owners of the Iconsiam shopping complex to improve its transport accessibility. |
| Dizin Forumlar Şartlar & Koşullar Editör Ekibi Karanlık Tema © TransPhoto Yönetimi & Fotoğrafların Sahipleri, 2002—2026
Bu sitedeki herhangi bir görüntüyü sahibinin izni olmadan kullanmak yasaktır.. |