|
Pilsētas elektrotransports |
Fotoattēli, pievienoti 12 jūnija 2023 g.
12.06 03:29 MSK |
|
Kuala Lumpur, Siemens Inspiro № 112 — Maršruts 9
Surian — Kota Damansara
Siemens Inspiro train of the MRT Line 9 designed by BMW Group Designworks.
• • •
Поезд метро Siemens Inspiro линии MRT 9, дизайна конструкторского бюро Designworks компании БМВ.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:29 MSK |
|
Kuala Lumpur, Siemens Inspiro № 112
Salons, aizmugures skats
An interior of the MRT Line 9 Siemens Inspiro train designed by BMW Group Designworks.
• • •
Салон поезда метро Siemens Inspiro линии MRT 9, дизайна конструкторского бюро Designworks компании БМВ.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:29 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Pasar Seni Station (MRT Line 9)
The MRT Line 9 is the only full metro line that passes through the city center.
Passengers a patiently waiting in lines at each of the trains' door during the 'rush' hour.
• • •
Линия MRT 9 — единственная линия полноценного метро, проходящая через центр города.
Час "пик", пассажиры терпеливо ждут в очередях к каждой из дверей поезда.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:29 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Muzium Negara — Semantan
A standard noise-protection structure over the elevated of the MRT Line 9.
• • •
Стандартные шумозащитные заграждения на эстакаде линии MRT 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur, Siemens Inspiro № 132 — Maršruts 9
Bandar Utama Station (MRT Line 9)
A standard elevated station of the MRT Line 9.
• • •
Стандартная станция на эстакаде линии MRT 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Bandar Utama Station (MRT Line 9)
A standard elevated station of the MRT Line 9.
• • •
Стандартная станция на эстакаде линии MRT 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Bandar Utama Station (MRT Line 9)
A standard elevated station of the MRT Line 9.
At Bandar Utama a transfer will be provided to the future LRT Line 11.
• • •
Стандартная станция на эстакаде линии MRT 9.
На станции Bandar Utama в будущем будет пересадка на строящуюся линию LRT 11.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur — Line 11 — LRT (Shah Alam Line)
Bundar Utama Station (LRT Line 11)
The LRT Line 11 under construction, with the opening planed for 2024.
Pictured is the northern Bundar Utama Terminal of the future line with the transfer to the MRT Line 9.
The photo was made through the window of a passing train.
• • •
Строительство линии LRT 11, открытие которой планируется в 2024 г.
На фото северная конечная Bundar Utama будущей линии, с пересадкой на линию метро MRT 9.
Фото сделано из окна проходящего поезда.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur, Siemens Inspiro № 112 — Maršruts 9 Kuala Lumpur — Line 9 —MRT (Kajang Line)
Surian — Kota Damansara
Siemens Inspiro trains of the MRT Line 9 designed by BMW Group Designworks.
• • •
Поезда метро Siemens Inspiro линии MRT 9, дизайна конструкторского бюро Designworks компании БМВ.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:28 MSK |
|
Kuala Lumpur, Siemens Inspiro № 150 — Maršruts 9 Kuala Lumpur — Line 9 —MRT (Kajang Line)
Surian — Kota Damansara
A train under a standard noise-protection structure over the elevated of the MRT Line 9.
• • •
Поезд под стандартным шумозащитным заграждением на эстакаде линии MRT 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:27 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Kwasa Damansara Terminal
Approaching the two-level Kwasa Damansara Terminal — a combined terminal at the western end of MRT Line 9 and MRT Line 12.
• • •
На подъезде к двухэтажной конечной станции Kwasa Damansara — совмещённой конечной по западным концам линии MRT 9 и MRT 12.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:27 MSK |
|
Kuala Lumpur, Siemens Inspiro № 141 — Maršruts 9 Kuala Lumpur — Line 9 —MRT (Kajang Line)
Kwasa Damansara Terminal
Approaching the two-level Kwasa Damansara Terminal — a combined terminal at the western end of MRT Line 9 and MRT Line 12.
• • •
На подъезде к двухэтажной конечной станции Kwasa Damansara — совмещённой конечной по западным концам линии MRT 9 и MRT 12.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:27 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line) Kuala Lumpur — Line 12 — MRT (Putrajaya Line)
Kampung Selamat — Kwasa Damansara
Layover tracks north of the Kwasa Damansara Terminal for MRT Line 9 on the left.
Through tracks for MRT Line 12 on the right.
The Sungai Buloh Depot of the Line 9 is visible in the background on the left.
• • •
Слева пути оборота составов к северу от коненчой Kwasa Damansara линии MRT 9.
Справа сквозные пути линии MRT 12.
На заднем плане слево видно депо Sungai Buloh линии 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:27 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Kampung Selamat — Kwasa Damansara
Access track to the Sungai Buloh Depot of the MRT Line 9.
• • •
Подъездные пути к депо Sungai Buloh линии MRT 9.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
12.06 03:27 MSK |
|
Kuala Lumpur — Line 9 —MRT (Kajang Line)
Sungai Buloh Depot
The Sungai Buloh Depot of the MRT Line 9.
The photo was made through the window of a passing train.
• • •
Депо Sungai Buloh линии MRT 9.
Фото сделано из окна поезда.
19 aprīli 2023 g., trešdiena Autors: Ymtram
|
Kopā pievienota izvēlētajam periodam: 485 Ir paradīts attēls: 19 no 19
|
|