TransPhoto

Nuotraukos publikuojamos tinklapyje „kaip yra“ ir neturi tikslo platinti bet kurias politines ir/ar ideologines pažiūras.

Turinys yra pateikiamas tinklapio vartotojų ir neatspindi tinklapio administracijos požiūrio.

Uždaryti
Vaslui, Gräf & Stift 858 GE112 M16 nr. VS 00125
  Vaslui Gräf & Stift 858 GE112 M16 nr. VS 00125 
 Gräf & Stift 858 GE112 M16 nr. VS 00124 
Autogara Transurb Vaslui
All of the trolleybuses in Vaslui are still out of service. This one has lacks in lightning and stands without electric collectors. Each one has a thick layer of dust inside. As I suppose, they are standing here since three years. What went wrong in Vaslui? They don't have electricians or a willingness to put in into service?

Autorius: BalkanExplorer           Data: 2019 m. rugsėjo 23 d., pirmadienis

Parodyti fotografavimo vietą žemėlapyje

Statistika

Licenzija: Copyright ©
Publikuota 15.03.2020 20:39 UTC
Peržiūrų — 1279

Detali informacija

Vaslui, Gräf & Stift 858 GE112 M16 nr. VS 00125

Lokacija:Trolleybus depot
Depas/Parkas:SC Transurb SA
Valstybinis numeris:VS 00125
Nuo...:2015
Modelis:Gräf & Stift 858 GE112 M16
Pagamintas:1991
Gamyklinis numeris:20
VIN:VAO8580020L000774
Dabartinė būsena:Nurašytas (2016)
Paskirtis:Keleivinis
Utilizuotas:2023-02
Pastaba:06.08.2015 ex Salzburg, 204 / S-119 JA; 2006 ex 9164

Nuotraukos parametrai

Model:ILCE-6000
Date and Time:23.09.2019 18:08
Exposure Time:1/60 sec
Aperture Value:5.6
ISO Speed:320
Focal Length:28 mm
Parodyti visą EXIF

Komentarai · 2

15.03.2020 22:21 UTC
Nuoroda
Andrei Andras · Brašovas
Foto: 439 · Tinklapio vertimas (RO/EN)
This year will be launched a tender for buying 10 new short trolleybuses.
These old trolleys have some iremedial problems at electrical components.
+2
+2 / –0
16.03.2020 07:13 UTC
Nuoroda
mpelov · Sofia
Foto: 95
Initially the problem was incompatible voltage. Despite the new overhead, the old substations were kept, which operated at 750 V. I read this problem was solved by technicians from Salzburg, although I don't know whether changes were made to the substations or the vehicles. Despite this, numerous electrical issues with the trolleybuses did not allow them to operate for any prolonged periods of time. Hopefully the new trolleybuses will arrive soon.
+2
+2 / –0

Komentaras

Už politikos aptarimą yra skiriamas mažiausiai 1 mėnesio pašalinimas
Jūs neprisijungėte.
Komentuoti gali tik registruoti vartotojai.